Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons

Short Description:


Service

Related Video

Feedback (2)

Adhering into the basic principle of "quality, assistance, effectiveness and growth", we have attained trusts and praises from domestic and worldwide client for Led Downlight Manufacturers, Led Light Panel, Simons Lighting, Now we have experienced manufacturing facilities with extra than 100 employees. So we could guarantee short lead time and high quality assurance.
Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons Detail:

Technical Parameter

Input Voltage 200V-240V CRI (Ra>) 80, 90
Power Factor >0.9 Working Frequency 50/60HZ
Temperature -2050℃ Lifetime 30000h
IP Rating IP54 Materials PP/ PC
Light Source LED LED Chip SMD 2835
CCT 3-CCT, Single CCT (3000K-6000K) Beam Angle 100º
Light Color Black/ White/ Silver/ Gold Installation Surface Mounted

 

 

Models

Model

Power

Diameter

Luminous

Efficiency

Luminous

Dimmable

CCT

SM-CL02-01-20

20W

285mm

80-100lm/w

1600-2000lm

Optional

3-CCT, Single CCT

SM-CL02-01-24

24W

285mm

80-100lm/w

1920-2400lm

Optional

3-CCT, Single CCT

SM-CL02-02-25

25W

365mm

80-100lm/w

2000-2500lm

Optional

3-CCT, Single CCT

SM-DL02-02-30

30W

365mm

80-100lm/w

2400-3000lm

Optional

3-CCT, Single CCT

SM-DL02-02-35

35W

365mm

80-100lm/w

2800-3500lm

Optional

3-CCT, Single CCT

SM-DL02-03-40

40W

500mm

80-100lm/w

3200-4000lm

Optional

3-CCT, Single CCT

SM-DL02-03-45

45W

500mm

80-100lm/w

3600-4500lm

Optional

3-CCT, Single CCT

SM-DL02-03-50

50W

500mm

80-100lm/w

4000-5000lm

Optional

3-CCT, Single CCT


Product detail pictures:

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function  – Simons detail pictures

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function  – Simons detail pictures

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function  – Simons detail pictures

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function  – Simons detail pictures


Related Product Guide:

We are also focusing on improving the stuff management and QC system so that we could keep great advantage in the fiercely-competitive business for Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons, The product will supply to all over the world, such as: Salt Lake City, Congo, Lahore, With a fully integrated operation system, our company has won a good fame for our high quality products, reasonable prices and good services. Meanwhile, we have established a strict quality management system conducted in material incoming, processing and delivery. Abiding by the principle of "Credit first and customer supremacy", we sincerely welcome clients from home and abroad to cooperate with us and advance together to create a brilliant future.

DL01-F-S正视图

  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Eleanore from Iraq - 2017.12.19 11:10
    In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Nick from Bulgaria - 2017.09.16 13:44

    Related Products