Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons

Short Description:


Service

Related Video

Feedback (2)

Gaining purchaser gratification is our firm's intention eternally. We will make wonderful endeavours to build new and top-quality merchandise, satisfy your exclusive needs and provide you with pre-sale, on-sale and after-sale products and services for Adjustable Dimmable Led Downlights, Smart Light Downlight, Industrial Chandelier, As a key enterprise of this industry, our company makes efforts to become a leading supplier, based on the faith of professional quality & worldwide service.
Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons Detail:

Technical Parameter

Input Voltage 200V-240V CRI (Ra>) 80, 90
Power Factor >0.9 Working Frequency 50/60HZ
Temperature -2050℃ Lifetime 30000h
IP Rating IP54 Materials PP/ PC
Light Source LED LED Chip SMD 2835
CCT 3-CCT, Single CCT (3000K-6000K) Beam Angle 100º
Light Color Black/ White/ Silver/ Gold Installation Surface Mounted

 

 

Models

Model

Power

Diameter

Luminous

Efficiency

Luminous

Dimmable

CCT

SM-CL02-01-20

20W

285mm

80-100lm/w

1600-2000lm

Optional

3-CCT, Single CCT

SM-CL02-01-24

24W

285mm

80-100lm/w

1920-2400lm

Optional

3-CCT, Single CCT

SM-CL02-02-25

25W

365mm

80-100lm/w

2000-2500lm

Optional

3-CCT, Single CCT

SM-DL02-02-30

30W

365mm

80-100lm/w

2400-3000lm

Optional

3-CCT, Single CCT

SM-DL02-02-35

35W

365mm

80-100lm/w

2800-3500lm

Optional

3-CCT, Single CCT

SM-DL02-03-40

40W

500mm

80-100lm/w

3200-4000lm

Optional

3-CCT, Single CCT

SM-DL02-03-45

45W

500mm

80-100lm/w

3600-4500lm

Optional

3-CCT, Single CCT

SM-DL02-03-50

50W

500mm

80-100lm/w

4000-5000lm

Optional

3-CCT, Single CCT


Product detail pictures:

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons detail pictures

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons detail pictures

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons detail pictures

Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons detail pictures


Related Product Guide:

We regularly perform our spirit of ''Innovation bringing progress, Highly-quality making certain subsistence, Administration marketing benefit, Credit score attracting customers for Short Lead Time for Ceiling Mounted Light - 20-50W IP54 LED Oyster with 3-CCT Function – Simons, The product will supply to all over the world, such as: panama, Sudan, Bolivia, By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified products and the control of the industry trend as well as our maturity before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.

DL01-F-S正视图

  • This is a very professional wholesaler, we always come to their company for procurement, good quality and cheap.
    5 Stars By Eve from USA - 2018.10.01 14:14
    The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Christopher Mabey from Morocco - 2018.05.22 12:13

    Related Products